Division 2, Engineering Design and Construction Standards consist of Earthwork, and Temporary Erosion and Sediment Control. Earthwork standard requirements are in the PDF file under “Content”.
Bremerton adopted the Washington State Department of Ecology “Stormwater Management Manual for Western Washington”, as amended in December 2014 (SWMMWW2014), as the guidance manual for Temporary Erosion and Sediment Control (TESC) requirements. TESC BMP requirements align with this manual. The SWMMWW2014, and standard drawings are available on Ecology’s website at the link below. Standard BMP drawings are available in PDF and DWG format. Click on the link under “SWMMWW2014 Manual and Drawings” to download the manual and/or drawings as needed.